About E-sources:
We mainly engaged in LED lighting,PCB&PCBA.We provide ODM, OEM service.
1, LED Lighting engaged in:ceiling light,down light,bulb light,panel light,flood light,and etc.
LED Chip:cooperate with Osram, ,CREE,Epistar,Nichia.
2,PCB&PCBA:LED lighting, industrial control, appliances, tablet PCs, medical equipments, and other electrics.
Our main customers: Philips, NVC, Midea, Ikea,HTC,HUAWEI,Haier,and etc.
Application:
1).Living room, bedroom, kitchen, washroom;
2).School, university, hospital, hotel;
3).Conference, meeting room, show room, showcase;
4).Commercial complexes;
5).Factory, plant, warehouse, office;
6).Supermarket, department store.
Features:
1) High brightness SMD5730
2) With conatant current driver, ensure human safety;
3) -20°~+45° working temperature/ lamp lifespan more than 25000hours
4) Enviromental friendly, soft lighting and high efficiency.
5) Designed with fire retardant PMMA diffuser cover and high brightess SMD5730 AS THE LIGHT SOURCE
5) No UV, no Mercury or hazardous materials
6) Cost-effective alternative for conventional ceiling replacement
7) Long lifespan ensuring low cost via electricity and maintenance savings
Product Specifications:
Round LED Ceiling lights |
Item NO. | Power (W) | Volt(V) | Ingress Protection (IP) | LEDS(pcs) | Luminous Flux (lm) | CCT | CRI(Ra) | Base Diameter (mm) | Lifespan(h) |
PY12-230 | 12±1W | 100-240V | 44 | 24 | 800lm ±10% | 5500-6500 | 75 | Φ230 | 25000 |
PY18-300 | 18±1W | 100-240V | 44 | 36 | 1200lm ±10% | 5500-6500 | 75 | Φ300 | 25000 |
PY24-350 | 24±1W | 100-240V | 44 |
|
|
|
|
|
|
FAQ
Q1:What is your products range?
§.We provide LED ceiling lights,LED panel lights,LED down lights,LED spot lights,LED Bulbs,LED street lights.
Q2:Do you provide material sourcing service?
§.We have our own industry chain. Our material sources are stable, high quality and low prices.
Q3:Do you provide complete unit assembly service?
§.Yes, include plastics, metal box, Coil, cable inside etc
Q4:What is your payment term ?
§.T/T or L/C at sight.and It ' s negotiable
Q5:What is you trade term?
§.FOB Guangzhou/Shenzhen port.
Q6:Do your pay for import taxes and duty?
§.No, they are not included. Clients should pay for them.
Q7:How long do you need to make samples? And how about the lead time?
§.About 15-20 days for samples, and about 45 days bulk production after get your payment
Q8:What about your shipping method?
§.We suggest you using our DHL, UPS, FedEx, TNT forwarder. By EMS (Usually for Russia Clients), price is high.
Q9:Can we visit your factory?
§.Yes, welcome to visit us any time.