LED Ceiling light CE ROHS IP66 LED BULKHEAD
Ningbo P-king lighting technology professional produce LED ceiling light ,LED waterproof light,LED panel light ,LED integrated waterproof light ,PLC lamp ,R7s lamp ,Corn light ect.
Technical data
Model | PK-290TA | PK-290TC | PK-300TA |
Power | 15W | 15W | 12W |
SMD parameters | 50-54LM/PC | 50-54LM/PC | 50-54LM/PC |
Lumens | 1150LM | 1150LM | 850LM |
Input voltage | AC100~240V 50/60Hz | AC100~240V 50/60Hz | AC100~240V 50/60Hz |
Insulation level | II | II | II |
Working temperature | -20~50ºC | -20~50ºC | -20~50ºC |
Color temperature | 2700-3200K/6000-6500K | 2700-3200K/6000-6500K | 2700-3200K/6000-6500K |
Bean angle | 180° | 180° | 180° |
PF | >0.9 | >0.9 | >0.9 |
LED lamp life span | 30,000H | 30,000H | 30,000H |
Installation | Recessed | Recessed | Recessed |
Best service:
1. We accept clients' special design and we will make our best to help clients to make the design become product;
2. We will protect your business in your sales area, protect ideas of design and all your private information;
3. Our experienced staff will give you rapid reply within 24hours. We can answer all your questions in fluent English. You can choose to send email or talk with us by phone or Skype.
Payment Terms:
1. Samples: Bank TT, 100% payment in advance;
2. Bulk order: Bank TT, 30% deposit and balance 70% settled before shipment.
Delivery time:
1. Samples: 3-7 working days;
2. Bulk order: 25-30 working days.
Warranty:
5 years warranty
Our Service:
1. Delivery in time;
2. Strict quality control system;
3. Promptly reply and solve on problems;
4. Strong production capacity;
5. Good after-sale service to remove your worries;
After-sale Service:
1. Quick reply on customers' questions;
2. If anything goes wrong with the products' quality, we will replace for you free and undertake the shipping cost.
3. Make you a happy ordering.
Shipping Method:
1. By Express: DHL, UPS, Fedex, a fast and safe way for shipping, normally 3-5 working days for delivery;
2. By Air: In some area, the shipping cost by air is more favorable than by Express; 5-7 days for delivery
3. By Sea: the most economic shipping method, but cost longer shipping time; large quantity, heavy and not urgent goods can choose this way.
4. Your shipping agent or forwarder.